ISUZU double-cab tow truck for Mongolia
A double-cab recovery configuration with a 5,400 × 2,300 mm platform, recorded in an April 2025 land export.

- Destination
- Mongolia · Ulaanbaatar
- Vehicle
- ISUZU Double-Cab 5200 Tow Truck
- Shipment scope
- One tow truck in a two-vehicle record
- Recorded shipment
- April 2025
Project background
The land export record covers two different ISUZU vehicles travelling through the Erenhot road border to Ulaanbaatar. One is a double-cab tow truck; the record does not describe two identical tow trucks.
The tow truck has a 5,200 mm wheelbase, with a 5,400 × 2,300 mm platform and a 4-ton winch. Its double cab provides crew space. The cab, recovery body and carried vehicle all need to be accounted for in the completed mass and axle distribution.
Record scope
Arrival, local registration and commissioning are not included in the available record.
Recorded configuration
| Chassis configuration | ISUZU Double-Cab 5200 |
|---|---|
| Wheelbase | 5,200 mm |
| Engine | 4HK1-TCG61, 190 hp |
| Transmission | ISUZU MLD six-speed manual |
| Recorded gross mass | 11 t |
| Platform | 5,400 × 2,300 mm |
| Winch | 4 t recorded |
| Chassis equipment | ABS, air brakes, differential lock and air conditioning |
Configuration considerations for a similar order
The points below can help you plan a new order. They do not describe how the original buyer made their decision.

Crew and platform space
The double cab and recovery body use part of the chassis capacity before a vehicle is loaded. Confirm the required seats and usable deck space, including restraint positions, then calculate the remaining payload. Gross mass is not cargo capacity.
Route geometry
The 5,200 mm wheelbase affects turning and breakover geometry. For a similar order, state overall-length limits and loading access, then check the finished vehicle’s approach and departure angles.
Climate and service
A winter package needs its own specification. State minimum temperatures and starting requirements, then specify suitable fluids and hydraulic components with local parts support. The recorded air conditioning, ABS and differential lock alone do not establish winter capability.
When this configuration fits the task
Recovery work requiring crew accommodation alongside a defined platform envelope.
When the specification needs to change
Tight urban access may favour a shorter wheelbase; heavier vehicles may need a different chassis and recovery system.
Checks to agree for a new order
Agree these documents and checks before approving the specification.
| Item | What it affects | Information to provide | Record to review |
|---|---|---|---|
| Platform | Supported vehicle and load distribution | Vehicle mass, wheelbase and clearance | Controlled deck drawing and rating |
| Chassis | Axle loading and route access | Operating route, turning space and target load | Completed dimensions and axle-load calculation |
| Winch / tow equipment | Pull or supported load under stated conditions | Required function, geometry and working positions | Component specifications and operating limits |
| Equipment | Fit, restraint and electrical interfaces | Attachments, work lights and accessory quantities | Signed installed-equipment list |
| Destination | Import and road-use acceptance | Importer requirements and destination checklist | Document and registration responsibility list |
Vehicle layout and supporting views
These configuration and supporting vehicle views illustrate the double-cab layout and recovery equipment. They are not evidence of arrival in Ulaanbaatar, cold-weather performance or the identity of both vehicles in the export record.
Prepare a new order
Questions answered
- What export stage is recorded for Mongolia?
- Export and shipment in April 2025; destination arrival is not recorded.
- What does the 5,400 mm value describe?
- It is the recorded platform length; the platform width is 2,300 mm. The chassis wheelbase is a different value, 5,200 mm. Neither dimension is a statement of carrying capacity or winch pull.
- Can the same configuration be ordered again?
- Component availability and the equipment package need a fresh review. A new quotation and signed specification determine the scope; this record is not a standing offer or destination approval.