Rotator Wrecker

For heavy vehicles, rollovers or difficult access, agree the recovery method before choosing a rotator. Check the boom chart, outriggers, ground loads, winches and rigging, then confirm the mass for road travel.

Rotator Lifting Capacity
30–50 t
Rotation Angle
360°
Boom Extension
3–10m

Technical specifications

Rotator Wrecker specifications published by KEEYAK
ItemValue
Equipment and published ratings
Rotator Lifting Capacity30–50 t
Rotation Angle360°
Boom Extension3–10m
Winch Capacity15–25 t (dual)
Outrigger Span5–8m
Operation TypeManual / Wireless Remote

Published configuration range · Data sheet v1.1 · Source checked · Supporting documents

Load path and rotator setup

Opposite front three-quarter view of the rotator wrecker, showing the boom base and side storage compartments

Typical work

  • Heavy-vehicle recovery
  • Rollover and obstacle clearance
  • Industrial and highway incident response

Configuration details

  • Recovery chart and boom geometry
  • Outrigger footprint and ground load
  • Winch arrangement and rigging
  • Travel mass and route restrictions
Casualty and load case
Describe the target vehicles, axle loads, recovery sequence and restraints.
Recovery body and equipment
State deck length, underlift, boom, winch, crane, rigging and control requirements.
Setup, route and traffic
Map setup ground, traffic space, route, braking and deployment footprint.

Acceptance requirements

  • Reconcile winch, boom, underlift, deck, restraints and accessories to the approved load-case schedule.
  • Witness the agreed functions and safety devices without treating a demonstration as a universal capacity proof.
  • Record completed-vehicle mass, axle loads, rated documentation, controls, manuals and exceptions.

Build and inspection

Final dimensions, installed equipment, route suitability and acceptance records are confirmed for the selected project.

Planning the lift

Can the rotator perform the proposed side lift?

Describe the disabled vehicle and intended load path, including the available setup ground. The permitted load depends on the operating chart, slew sector and support arrangement. Rotation alone does not establish that a side lift is permitted.

How does capacity change as the load moves?

Use the rating for the required radius and load path. The maximum lifting figure is not available throughout the working envelope. A demonstration records one tested setup; the chart still defines the limits at other positions.

Is an underlift included?

Check the selected equipment schedule. Its transport arrangement is relevant only when an underlift is fitted.

What is removed or packed separately for shipping?

Identify equipment removed for shipment and list loose rigging, hooks and accessories. Provide the actual stowed dimensions for the carrier's handling plan.

Specify your Rotator Wrecker

Share the operating duty, destination and equipment requirements.

Configure this vehicle